●Hotel will suspend the bus service to AEON MALL as follows.
Date: On 1st Jan to 5th Jan , (11th to 13th Jan), (18th to 19th Jan),(25th to 26th Jan,
* Any other questions, please contact the hotel directly.
●We will be conducting a statutory inspection of the electrical equipment on the following dates. As a result, all electrical equipment, except for the fire safety equipment, will be shut down throughout the entire building.
Date: Start of preparation May 7th(Wed), 2025 11:00p.m.
May 8th(Thu), 2025 0:00a.m.~5:00a.m.
■During this period, you will not be able to use below facilities.■
Television, Indoor lighting, Refrigerator, Internet, Hot shower, Air conditioning, Outside Telephone line, Electric Kettle
*Please note that the elevators will not be available 30 minutes before and after the power outage due to a switch to backup power.
We sincerely apologize for any inconvenience this may cause and kindly ask for your understanding and cooperation.
パスワード再設定
または
xxxxxxxxx@gmail.com宛にメールを送信したのでご確認ください。
ログイン画面に戻る
finished
Please be advised that on the date and time indicated below, Electric system will be shut down on the hotel building due to the legal inspection of electrical equipment.
Preparation:
May 8th(Mon), 2023 11:00 p.m.-
Power outage:
May 9th(Tue), 2023 12:00 a.m. - 5:00 a.m.
* Return of power is scheduled.
During this period, following facilities will not be able to use.
1. Television 2. Room lights 3. Refrigerator 4. Internet
5.Hot-shower (in the bathroom) 6. Air-condition 7. Telephone (outside call)
8.Hot water-maker
・Telephone system will be operating for in house extension only.
・The convenience store will be closed during the blackout.
・Elevators stop 30 minutes before and after the inspection.
・The guest who check out early morning please inform us beforehand.
(Extension number 2)
We would like to thank you in advance for your understanding.